The UK Multifoil Guide · Installation and performance

    What paperwork should you have for multifoil insulation?

    Last reviewed 26 November 2026 by Jan Pospisil, DEA qualified (ABBE Level 3)

    Reviewed weekly: every fact checked against the news and its sources. Page last updated 10 November 2026.

    Includes time-sensitive information: checked in the weekly sweep

    Independent: SprayFoamCheck doesn't install or remove insulation and takes no referral fees.

    Short answer

    Keep the quote, contract and invoice naming the exact product, the product approval it was fitted to, the U-value calculation, any building control paperwork and any warranty. No source we hold lists paperwork for multifoil by name, as of 10 November 2026; this list is built from what the product approvals require and what the standard property form asks.[1][2][3][4]

    Your next step:Get the foil checked independently

    On this page

    Key facts

    • Each BBA product approval opened covers named products, and every worked example in them includes other insulation as well as the multifoil.[1][2][3]
    • The BBA says a product or use that is not in its document has not been verified.[5][6]
    • The BBA says its documents do not cover warranties, or the consequences of poor installation.[5][6]
    • UKAS suspended the BBA on 26 February 2026; on 15 June 2026 it said existing approvals stay valid until they expire.[7]
    • The two LABC registered details opened had stated validity dates that ended on 11 November 2018 and 11 November 2019.[8]
    • No edition of the TA6 property information form asks what insulation a home has. It asks about building work and warranties.[4][9]
    • RICS's list of documents for spray foam owners to keep (March 2023) does not mention foil or multifoil.[10]

    What paperwork should you have?

    Six things: the contract papers, the product approval, the U-value calculation, any building control paperwork, any warranty, and photographs taken before the work was covered.

    DocumentWhy it mattersWho to ask
    Quote, contract and invoice naming the exact productEach BBA approval opened covers named products, and the declared figures differ by product.[1][2][3]Ask the installer for copies
    The product approval the job was fitted toThe BBA says a product or use that is not in its document has not been verified.[5][6]Ask the installer which approval applies, and for a copy
    U-value calculation for your roofEvery worked example in the three BBA approvals opened includes other insulation as well as the multifoil.[1][2][3]Ask the installer for it, or ask who designed the job
    Building control paperwork, if Building Regulations appliedThe property information form asks about building work and completion paperwork.[4]Ask the installer whether building control was involved, and for any completion paperwork
    Any warrantyThe property information form asks about warranties. The BBA says its documents do not cover them.[4][5][6]Ask whoever offered it for a copy in writing
    Photographs taken before the plasterboard went onThe three BBA approvals opened describe plasterboard fixed to the battens.[1][2][3] Once it is on, the foil, tape and battens are behind it.Ask the installer for any taken, and keep your own

    The last column is our advice on who to ask, not a sourced fact. No source we hold lists paperwork for multifoil by name. The nearest is the RICS consumer guide on spray foam (March 2023), which asks owners to keep the contract, the thermal and condensation risk calculations, records of roof works, any warranty, any independent product approval, photographs and moisture readings, and the handover file. It does not mention foil or multifoil, so we use it only as a comparison.[10] The Spray Foam Guide has its own paperwork page.

    Keep the date of the contract too. For doorstep and phone sales, a guide of November 2025 from the Chartered Trading Standards Institute (CTSI), written about spray foam sales, describes a 14-day cancellation period for off-premises contracts.[11] Your rights and redress has more.

    Checklist

    Multifoil installation and paperwork checklist

    What the product approvals we opened ask for, and the paperwork that shows it was done. Tick what you have or can see. Print or save the list to take to the installer, building control or a surveyor.

    0 of 22 items ticked

    Paperwork

    Based on: LABC (council-hosted) (April 2008) (opens in a new tab)

    Based on: BBA (27 January 2017, amended 3 August 2017) (opens in a new tab); BBA (26 September and 9 October 2018) (opens in a new tab); BBA (fourth issue 26 March 2015) (opens in a new tab); Kiwa (June 2021) (opens in a new tab); LABC (opens in a new tab)

    Checking a product approval

    Based on: BBA (27 January 2017, amended 3 August 2017) (opens in a new tab); BBA (26 September and 9 October 2018) (opens in a new tab); BBA (fourth issue 26 March 2015) (opens in a new tab); BRE (hosted by CIBSE) (published November 2020) (opens in a new tab)

    Based on: BBA (27 January 2017, amended 3 August 2017) (opens in a new tab); BBA (26 September and 9 October 2018) (opens in a new tab); BBA (fourth issue 26 March 2015) (opens in a new tab)

    Based on: Law Society (2024) (opens in a new tab)

    Based on: RICS (March 2023; date from the guide's PDF, the web page shows none) (opens in a new tab)

    What you can see where the foil is on show, or before it is covered

    Based on: BBA (27 January 2017, amended 3 August 2017) (opens in a new tab); BBA (26 September and 9 October 2018) (opens in a new tab)

    Based on: BBA (27 January 2017, amended 3 August 2017) (opens in a new tab); BBA (26 September and 9 October 2018) (opens in a new tab); BBA (fourth issue 26 March 2015) (opens in a new tab)

    Based on: BBA (27 January 2017, amended 3 August 2017) (opens in a new tab); BBA (26 September and 9 October 2018) (opens in a new tab); BBA (fourth issue 26 March 2015) (opens in a new tab)

    Based on: BBA (27 January 2017, amended 3 August 2017) (opens in a new tab); BBA (26 September and 9 October 2018) (opens in a new tab)

    Based on: BBA (27 January 2017, amended 3 August 2017) (opens in a new tab); BBA (26 September and 9 October 2018) (opens in a new tab); BBA (fourth issue 26 March 2015) (opens in a new tab)

    Based on: BRE (hosted by CIBSE) (published November 2020) (opens in a new tab); BBA (27 January 2017, amended 3 August 2017) (opens in a new tab); BBA (26 September and 9 October 2018) (opens in a new tab); BBA (fourth issue 26 March 2015) (opens in a new tab)

    Based on: BBA (27 January 2017, amended 3 August 2017) (opens in a new tab); BBA (26 September and 9 October 2018) (opens in a new tab); BBA (fourth issue 26 March 2015) (opens in a new tab)

    Based on: BBA (27 January 2017, amended 3 August 2017) (opens in a new tab); BBA (fourth issue 26 March 2015) (opens in a new tab); HSE as Building Safety Regulator (February 2024, published 28 March 2024) (opens in a new tab)

    Based on: LABC (council-hosted) (April 2008) (opens in a new tab)

    Heat, flues and electrics

    Based on: BBA (27 January 2017, amended 3 August 2017) (opens in a new tab); BBA (26 September and 9 October 2018) (opens in a new tab); BBA (fourth issue 26 March 2015) (opens in a new tab)

    Based on: BBA (27 January 2017, amended 3 August 2017) (opens in a new tab); BBA (26 September and 9 October 2018) (opens in a new tab); BBA (fourth issue 26 March 2015) (opens in a new tab)

    Based on: BBA (27 January 2017, amended 3 August 2017) (opens in a new tab); BBA (26 September and 9 October 2018) (opens in a new tab); BBA (fourth issue 26 March 2015) (opens in a new tab); MHCLG (2022 amendments) (opens in a new tab)

    Based on: BBA (26 September and 9 October 2018) (opens in a new tab); NICEIC in Professional Electrician (20 May 2021) (opens in a new tab)

    Based on: BBA (26 September and 9 October 2018) (opens in a new tab)

    If something is missing

    • Ask the installer in writing, and keep the reply.
    • LABC's guidance treats a multifoil as acceptable when it is used strictly as its product approval sets out, so a mismatch matters even if the paperwork looks complete.

      Based on: LABC (council-hosted) (April 2008) (opens in a new tab)

    • Behind plasterboard, most of this list can't be seen. An inspection records what can be seen and tested, and says what is hidden.

    Read more:How to check multifoil was installed properlyMultifoil product approvalsMultifoil fitted after spray foam removalAfter removal: what good looks like

    Does the product on the paperwork match the product in the roof?

    Only a comparison of the two can tell you, and it matters because each product approval we opened covers named products.

    Is the product approval for this use?

    Check the use and the date as well as the product name, because the BBA says a product or use that is not in its document has not been verified.

    Is there a U-value calculation?

    Ask for one, because a product approval on its own does not show what your roof achieves.

    Was building control involved?

    Your paperwork should say, and we hold no source that tells us which multifoil jobs must go through building control.

    What does a multifoil warranty cover?

    We cannot tell you, because we have not opened a multifoil warranty, from a manufacturer or an installer, as of 10 November 2026.

    What if paperwork is missing?

    Missing paperwork is not proof of a fault, and not every multifoil installation is a problem.

    What will a buyer's side ask for?

    We cannot say what any buyer, conveyancer or surveyor will ask for.

    What to do next

    • Put the quote, contract, invoice and any warranty in one place, and note the exact product name on each.
    • Ask the installer in writing for the product approval, the U-value calculation and any building control paperwork.
    • Check the product name, the use and the dates on the approval against what you were told.
    • If something is missing or does not match, an independent inspection can record what is there.
    Your next step

    Get the foil checked independently

    A Multifoil / Foil Inspection records what is fitted, how it is fixed and sealed, the air gaps and ventilation that can be seen, and moisture readings at the timbers that can be reached.

    Multifoil / Foil Insulation Inspection£295

    Report within 48–72 hours of inspection. Independent: no installation, no removal, no referral commissions.

    Travel included within about three hours of the North West; a fixed supplement further away, shown with your total before you book.

    It's evidence for your own decisions. It records what can be seen and measured, and says what is hidden.

    Questions first? Call or WhatsApp 07349 718935 WhatsApp (opens in a new tab)

    Not sure yet? Use the installation checklist

    Case files like this

    Anonymised inspections Jan has carried out. Every loft is different.

    See all case files

    Go deeper: the original sources

    4 original documents, each with a note on what it covers.

    Questions people ask

    Is my multifoil's BBA approval still valid?

    UKAS said on 15 June 2026 that existing BBA approvals remain valid until they expire.[7] UKAS suspended the BBA on 26 February 2026, and the suspension can run to 25 November 2026 at the latest.[7][19] We found no outcome, as of 10 November 2026. We have not yet searched the BBA's own lookup tool, MyBBA Search, which asks for an account; check the status of yours there.[15]

    Does multifoil need building control sign-off?

    We hold no source that says which multifoil jobs must go through building control, so we cannot answer for your job. Approved Document L for England sets roof U-values for work on existing homes.[16] The BBA lists as a misconception the idea that a BBA-approved product meets Building Regulations automatically.[5][6] Ask the installer whether the work was notified.

    My paperwork says the multifoil is LABC registered. What does that mean?

    It points to an LABC registered detail, which is LABC's document for a named product. A common claim is that this means the product is accepted across England and Wales. The two details we opened had stated validity dates that ended on 11 November 2018 and 11 November 2019, and both call for a site-specific thermal analysis.[8] So check the date on yours, and ask for the analysis for your roof.

    Sources

    19 sources, numbered as cited in the text. Tap a footnote number to jump to its source.

    Call Email WhatsApp